Announcement No. 01 on the results of the Cambodian Cabinet Meeting on 05 April 2019
សេចក្តីប្រកាសព័ត៌មានលេខ ០១ ស្តីពី លទ្ធផលនៃសម័យប្រជុំពេញអង្គគណៈរដ្ឋមន្ត្រី នាថ្ងៃទី០៥ ខែមេសា ឆ្នាំ២០១៩
- Number
- 01
- Date
- · Others from 2019
- Type
- Other instruments
- Status
- Signed and in effect
- Issuing body
- Minister of environment; Minister of mines and energy
- Languages
- Khmer
- Licence
- No licence stated by the publisher
Summary from Open Development Cambodia
The government has approved SPHP (Cambodia) to invest in a new hydroelectric dam in Pursat river with capacity of 80-megawatt and built under a build-operate-transfer (BOT) basis. Schnei Tec was approved to invest in two solar-power stations built under a build-owned-operate (BOO) framework of 60 MW in Kampong Chhnang and 60 MW in Pursat, and boost its Kampong Speu province station’s capacity by 20MW. In addition, the meeting approved the draft law on oil management and production, and the draft national policy on school health.
Original documents
This page shows record details only. The text of the instrument is in the original document.
Metadata: Open Development Cambodia (licence not stated by the publisher).