CambodiaGovData

Webpage capture on the news article of Royal Group to do study on 700MW power plant

Webpage capture on the article of Royal Group to do study on 700MW power plant briefs on the feasibility study on a 700-megawatt coal-fired power plant in Preah Sihanouk province. The article was posted by the Khmer Times on 18 June 2019.

Publisher:
Open Development Cambodia
Licence:
License not specified
Category:
Coal
Source portal:
odc
Updated:
07/02/2022

Record last updated 1748 days ago

Data files (1)

This dataset carries no explicit licence, so we link to the publisher’s file rather than redistributing a copy. Check the terms of use with the publisher.

  • PDFWebpage capture on the article of Royal Group to do study on 700MW power plant1.2 MB

    Webpage capture on the article of Royal Group to do study on 700MW power plant briefs on the feasibility study on a 700-megawatt coal-fired power plant in Preah Sihanouk province. The article was posted by Khmer Times on 18 June 2019.

    View at source →

More from this publisher

All datasets from this publisher