CambodiaGovData

Final Report on Preparatory Survey for Phnom Penh Transmission Line and Distribution System Construction Project

The Final Report on Preparatory Survey for Phnom Penh Transmission Line and Distribution System Construction Project, written by Electricité du Cambodge (EDC), aims to improve power supply by reinforcing transmission lines, substations and distribution lines in the Phnom Penh metropolitan area. This Preparatory Survey will review the necessity, feasibility, technical aspects of the construction of the transmission line and the distribution system in Phnom Penh which is to be proposed. It will analyze current conditions, the expansion of power plants and their transmission lines based on the load flow and short circuit study.

Publisher:
Open Development Cambodia
Licence:
CC-BY-SA-4.0
Category:
Energy
Source portal:
odc
Updated:
15/05/2024

Record last updated 920 days ago

Data files (1)

  • PDFReport on Preparatory Survey for Phnom Penh Transmission Line and Distribution System Construction Project6.5 MB

    The Final Report on Preparatory Survey for Phnom Penh Transmission Line and Distribution System Construction Project, written by Electricité du Cambodge (EDC), aims to improve power supply by reinforcing transmission lines, substations and distribution lines in the Phnom Penh metropolitan area. This

    Download →

More from this publisher

All datasets from this publisher