The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and International Port.

Publisher:
Open Development Cambodia
Licence:
Creative Commons Attribution Share-Alike
Category:
Environmental impact assessments
Source portal:
odc
Updated:
05/10/2022

Record last updated 1508 days ago

Data files (16)

  • PDFTable of Content15 MB

    The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and Internation

    Download →
  • PDFChapter 1: Introduction4.4 MB

    The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and Internation

    Download →
  • PDFChapter 2: Legal framework5.6 MB

    The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and Internation

    Download →
  • PDFChapter 3: Project description15 MB

    The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and Internation

    Download →
  • PDFChapter 4: Existing environmental resources (1)48 MB

    The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and Internation

    Download →
  • PDFChapter 4: Existing environmental resources​ (2)40 MB

    The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and Internation

    Download →
  • PDFChapter 4: Existing environmental resources (3)39 MB

    The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and Internation

    Download →
  • PDFChapter 4: Existing environmental resources (4)21 MB

    The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and Internation

    Download →
  • PDFChapter 5: Public discussion14 MB

    The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and Internation

    Download →
  • PDFChapter 6: Environmental impact assessment and measures37 MB

    The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and Internation

    Download →
  • PDFChapter 7: Environmental management plan3.9 MB

    The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and Internation

    Download →
  • PDFChapter 8: Conclusion and recommendation3.9 MB

    The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and Internation

    Download →
  • PDFReference2.0 MB

    The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and Internation

    Download →
  • PDFAppendix (1)39 MB

    The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and Internation

    Download →
  • PDFAppendix (2)56 MB

    The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and Internation

    Download →
  • PDFAppendix (3)42 MB

    The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and Internation