CambodiaGovData

[Draft] Environmental impact assessment for Lower Sesan 2 hydropower project in Stung Treng province, Cambodia

The length of the main dam is 8km with crest 83m above the sea level and 40m above the river.​​ The Lower Sesan II is located in Sesan district, Stung Treng province, Cambodia about 20 km east of Stung Treng provincial town, 450km northeast of Phnom Penh, 60km from the Lao border and 150km from the Vietnamese border. Positive impacts on the environment and society for the project include: 1/. Electricity: 400 MW turbine and total power 1953.9 GWh; 2/. Rural Infrastructure: The project will build a new road to the bypass and bridge project area on the east side of the Sesan River to connect the resettlement area of ​​Srekor village and Khsach Thmey village. The project also builds all community facilities in the resettlement area, including community schools, pagodas, roads, and wells, to a number and standards equivalent to or better than what will be destroyed in the village, which will be flooded; 3/. Employment: Employment for community workers/people from 2010 to 2014 with a total of approximately 9,500; 4/. Tourism: Natural resources in and around the lake, infrastructure projects and visits to hydropower plants, fishing; 5/. Revenue: Selling local products, tourism activities, construction contractors; 6/. Economy: Develop Cambodia's infrastructure, including industry/handicraft, agriculture, and tourism in the region, paying taxes to the Royal Government of Cambodia through investment law contracts. The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million.

Publisher:
Open Development Cambodia
Licence:
License not specified
Category:
Hydropower dams
Source portal:
odc
Updated:
05/10/2022

Record last updated 1508 days ago

Data files (21)

This dataset carries no explicit licence, so we link to the publisher’s file rather than redistributing a copy. Check the terms of use with the publisher.

  • PDFTable of content12 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFExecutive summary12 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFChapter 1: Introduction6.3 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFChapter 2: Law and Related Regulations11 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFChapter 3: Project description9.1 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFChapter 4: Existing environment (1)55 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFChapter 4: Existing Environment (2)48 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFChapter 5: Selection9.4 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFChapter 6: Environmental Impact and Mitigation49 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFChapter 7: Public Participation15 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFChapter 8: Environmental Management Plan25 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFChapter 9: Economic Analysis13 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFChapter 10: Conclusion and Recommendation6.2 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFAppendix 1A and 1B25 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFAppendix 113 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFAppendix 2, 3, and 416 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFAppendix 530 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFAppendix 66.4 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFAddition 1 and 252 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFAddition 360 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →
  • PDFAddition 439 MB

    The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level

    View at source →

More from this publisher

All datasets from this publisher