Cambodia: Greater Mekong Subregion Transmission Project

This report has 4 main sections namely project description, evaluation of design and implementation, evaluation of performance and overall assessment and recommendations. This project was estimated to cost $95.0 million, and ADB was to provide a loan for the equivalent $44.3 million from its Special Funds resources to finance 46% of the project cost. At the project completion, the cost cam to $76.0 million, of which ADB financed $38.9 million, or about 51%. The constructions actually commenced in January 2007 and were completed in November 2011.

Publisher:
Open Development Cambodia
Licence:
CC-BY-SA-4.0
Category:
Energy
Source portal:
odc
Updated:
15/07/2016

Record last updated 3781 days ago

Data files (1)

  • PDFCambodia: Greater Mekong Subregion Transmission Project

    A completion report on Greater Mekong Subregion Transmission Project in Cambodia by Asian Development Bank. This report has 4 mains sections namely project description, evaluation of design and implementation, evaluation of performance and overall assessment and recommendations. This project was a

    Download →

More from this publisher

All datasets from this publisher